Dream Library construction update

The remaining exterior work at the Dream Library is down to roofing and painting. The focus will turn soon to the interior finish work of electrical, plumbing, and bookcase installation. Designing and installing a spiral staircase from the second floor to the third floor tower will be a special aesthetic and practical task. When the weather becomes less soggy, careful attention will go to perimeter landscaping, with the top priority of long-term fire safety–a vital concern for a  building full of paper, built of wood, and surrounded by a forest.